Complete Refurbishment of top floor balcony
The client had a problem with a previous installation of balcony, the poor installation eventually caused tiles to crack and water to penetrate the substructure and leaking in to the bedroom underneath.
Before work could begun we arranged scaffold and appropriate license with the local council
total gutting of existing tiles and substructure as it was completely rotten
repair to underlying celling and new installation of OSB board
laying of GRP (fibreglass) across entire balcony to form a stable waterproof barrier
installation of composite decking on top of composite frame work
fitting of IP67 water proof decking lights